warmbox/docs/16-roadmap.md

4 KiB
Raw Blame History

Product Roadmap

Phase 0 — Foundation (complete)

Status: Done

  • Barebone MVP: flat inbox pool, dispatcher, rescuer, AI, REST API
  • Prisma 7 + SQLite
  • OpenRouter AI integration
  • Documentation scaffold (this folder)

Phase 1 — Production warmup core (810 weeks)

Goal: Reliable multi-primary warmup with recipes, roles, and stats. Self-hosted backend only.

Sprint 1.1 — Domain model & roles (2 weeks)

  • Add role to mailbox (primary / satellite)
  • Add WarmupCampaign entity
  • Campaign ↔ satellite assignments
  • Migrate existing inboxes
  • Deprecate flat random pairing

Deliverable: API to create campaign with satellites; no sends yet.

Sprint 1.2 — Recipe engine (2 weeks)

  • Implement Grow, Flat, Randomized, Custom
  • DailySchedule generation
  • Duration 3045 days, min/max validation
  • 48h volume cap
  • POST /recipes/preview

Deliverable: Unit-tested schedule for all 4 recipes.

Sprint 1.3 — Campaign dispatcher (2 weeks)

  • Role-aware send: satellite → primary only
  • Reply path: primary → satellite
  • Jitter + send windows
  • Campaign day rollover
  • Idempotency keys

Deliverable: End-to-end warmup with one primary + 4 satellites.

Sprint 1.4 — Reply rate engine (1 week)

  • Probabilistic 30% default replies
  • engaged_no_reply status
  • Daily reply budget tracking

Deliverable: Reply rate within ±5% of target over 7 days.

Sprint 1.5 — Stats API (1 week)

  • DailyStat rollups
  • /campaigns/:id/stats/today and /stats/daily
  • On-track calculation

Deliverable: JSON stats matching manual log counts.

Sprint 1.6 — AI content validator (1 week)

  • Placeholder regex rejection
  • Spam word tiers
  • Regenerate loop (max 3)
  • Mailbox profile (name, company)

Deliverable: Zero placeholder emails in 100-test run.


Phase 2 — Operator experience (68 weeks)

Goal: Web UI + hardening for FillCare daily use.

Sprint 2.1 — Web dashboard MVP (3 weeks)

  • Vite + React + shadcn
  • Dashboard, campaign wizard, campaign detail
  • Mailbox add/test flows

Sprint 2.2 — Spam rescue hardening (2 weeks)

  • Per-UID log matching
  • Placement tracking
  • Folder auto-discovery
  • Auto-pause on spam thresholds

Sprint 2.3 — DNS & health checks (1 week)

  • SPF/DKIM/DMARC preflight
  • Provider presets (Gmail/Yahoo/Outlook)

Sprint 2.4 — Job queue (2 weeks)

  • Replace batch cron with queued sends
  • Manual job triggers for dev
  • Better overlap protection

Phase 3 — SaaS readiness (812 weeks)

Goal: Multi-tenant, billing, optional integrations.

  • Postgres migration path
  • Workspace + JWT auth
  • Stripe billing per primary
  • Webhooks (campaign events)
  • Google Postmaster integration
  • Session-based web auth
  • Optional peer network (beta)

Phase 4 — Scale & ecosystem (ongoing)

  • Instantly / Smartlead sync
  • Inbox placement tests
  • Team roles
  • White-label
  • Mobile notifications

Milestone timeline (visual)

2026 Q2  [Phase 1: Core backend        ████████░░]
2026 Q3  [Phase 2: Web UI + hardening  ░░░░████████]
2026 Q4  [Phase 3: SaaS beta           ░░░░░░░░████]

FillCare-specific milestone

Week Milestone
1 hello@fillcareapp.com campaign created, 4 satellites assigned
2 Grow recipe running, stats visible via API
4 Web dashboard live
6 30-day warmup complete, inbox rate ≥95%
8 Maintenance mode + cold email tool connected

Definition of done (per phase)

Phase 1 done when

  • 2+ primaries warming concurrently
  • All 4 recipes pass integration tests
  • Stats API accurate
  • Reply rate configurable and honored
  • AI validator blocks placeholders
  • ESP compliance checklist passable

Phase 2 done when

  • Operator never needs curl for daily use
  • Auto-pause tested on simulated spam spike
  • FillCare running 30-day campaign via UI

Phase 3 done when

  • Second customer onboarded in isolated workspace
  • Billing active
  • Security review complete