4 KiB
4 KiB
Product Roadmap
Phase 0 — Foundation (complete)
Status: Done
- Barebone MVP: flat inbox pool, dispatcher, rescuer, AI, REST API
- Prisma 7 + SQLite
- OpenRouter AI integration
- Documentation scaffold (this folder)
Phase 1 — Production warmup core (8–10 weeks)
Goal: Reliable multi-primary warmup with recipes, roles, and stats. Self-hosted backend only.
Sprint 1.1 — Domain model & roles (2 weeks)
- Add
roleto mailbox (primary / satellite) - Add
WarmupCampaignentity - Campaign ↔ satellite assignments
- Migrate existing inboxes
- Deprecate flat random pairing
Deliverable: API to create campaign with satellites; no sends yet.
Sprint 1.2 — Recipe engine (2 weeks)
- Implement Grow, Flat, Randomized, Custom
DailySchedulegeneration- Duration 30–45 days, min/max validation
- 48h volume cap
POST /recipes/preview
Deliverable: Unit-tested schedule for all 4 recipes.
Sprint 1.3 — Campaign dispatcher (2 weeks)
- Role-aware send: satellite → primary only
- Reply path: primary → satellite
- Jitter + send windows
- Campaign day rollover
- Idempotency keys
Deliverable: End-to-end warmup with one primary + 4 satellites.
Sprint 1.4 — Reply rate engine (1 week)
- Probabilistic 30% default replies
engaged_no_replystatus- Daily reply budget tracking
Deliverable: Reply rate within ±5% of target over 7 days.
Sprint 1.5 — Stats API (1 week)
DailyStatrollups/campaigns/:id/stats/todayand/stats/daily- On-track calculation
Deliverable: JSON stats matching manual log counts.
Sprint 1.6 — AI content validator (1 week)
- Placeholder regex rejection
- Spam word tiers
- Regenerate loop (max 3)
- Mailbox profile (name, company)
Deliverable: Zero placeholder emails in 100-test run.
Phase 2 — Operator experience (6–8 weeks)
Goal: Web UI + hardening for FillCare daily use.
Sprint 2.1 — Web dashboard MVP (3 weeks)
- Vite + React + shadcn
- Dashboard, campaign wizard, campaign detail
- Mailbox add/test flows
Sprint 2.2 — Spam rescue hardening (2 weeks)
- Per-UID log matching
- Placement tracking
- Folder auto-discovery
- Auto-pause on spam thresholds
Sprint 2.3 — DNS & health checks (1 week)
- SPF/DKIM/DMARC preflight
- Provider presets (Gmail/Yahoo/Outlook)
Sprint 2.4 — Job queue (2 weeks)
- Replace batch cron with queued sends
- Manual job triggers for dev
- Better overlap protection
Phase 3 — SaaS readiness (8–12 weeks)
Goal: Multi-tenant, billing, optional integrations.
- Postgres migration path
- Workspace + JWT auth
- Stripe billing per primary
- Webhooks (campaign events)
- Google Postmaster integration
- Session-based web auth
- Optional peer network (beta)
Phase 4 — Scale & ecosystem (ongoing)
- Instantly / Smartlead sync
- Inbox placement tests
- Team roles
- White-label
- Mobile notifications
Milestone timeline (visual)
2026 Q2 [Phase 1: Core backend ████████░░]
2026 Q3 [Phase 2: Web UI + hardening ░░░░████████]
2026 Q4 [Phase 3: SaaS beta ░░░░░░░░████]
FillCare-specific milestone
| Week | Milestone |
|---|---|
| 1 | hello@fillcareapp.com campaign created, 4 satellites assigned |
| 2 | Grow recipe running, stats visible via API |
| 4 | Web dashboard live |
| 6 | 30-day warmup complete, inbox rate ≥95% |
| 8 | Maintenance mode + cold email tool connected |
Definition of done (per phase)
Phase 1 done when
- 2+ primaries warming concurrently
- All 4 recipes pass integration tests
- Stats API accurate
- Reply rate configurable and honored
- AI validator blocks placeholders
- ESP compliance checklist passable
Phase 2 done when
- Operator never needs curl for daily use
- Auto-pause tested on simulated spam spike
- FillCare running 30-day campaign via UI
Phase 3 done when
- Second customer onboarded in isolated workspace
- Billing active
- Security review complete