warmbox/docs/16-roadmap.md

5.1 KiB
Raw Blame History

Product Roadmap

Phase 0 — Foundation (complete)

Status: Done

  • Barebone MVP: flat inbox pool, dispatcher, rescuer, AI, REST API
  • Prisma 7 + SQLite
  • OpenRouter AI integration
  • Documentation scaffold (this folder)

Phase 1 — Production warmup core (810 weeks) — Done

Goal: Reliable multi-primary warmup with recipes, roles, and stats. Self-hosted backend only.

Sprint 1.1 — Domain model & roles (2 weeks) — Done

  • Workspace, WarmupCampaign, satellite assignments, Grow recipe, AI validator
  • Campaign API; legacy dispatcher gated when campaigns exist

Deliverable: API to create campaign with satellites; Grow schedule + preview.

Sprint 1.2 + 1.3 — Recipes + live dispatcher (combined) — Done

  • All 4 recipes: Grow, Flat, Randomized, Custom
  • Campaign dispatcher (satellite → primary), send windows, jitter
  • Day rollover, maintenance at 20%, campaign-aware rescuer

Deliverable: End-to-end warmup with any recipe; emails actually send.

Sprint 1.2 — Recipe engine (original scope, absorbed)

  • Implement Grow, Flat, Randomized, Custom → shipped in 1.2+1.3 combined sprint
  • Grow + preview delivered in 1.1; remainder completed in 1.2+1.3

Sprint 1.3 — Campaign dispatcher (original scope, absorbed)

  • Role-aware send, jitter, rollover → shipped in 1.2+1.3 combined sprint

Sprint 1.4 — Reply rate engine (1 week) — Done

  • Probabilistic 30% default replies, engaged_no_reply status
  • Daily reply budget tracking, spam counter increments
  • See docs/sprints/sprint-1.4.md

Deliverable: Reply rate within ±5% of target over 7 days.

Sprint 1.5 — Stats API (1 week) — Done

  • DailyStat rollups, stats endpoints, workspace overview
  • On-track calculation, compliance API (warn-only DNS)
  • See docs/sprints/sprint-1.5.md

Deliverable: JSON stats matching manual log counts.

Sprint 1.6 — AI content validator (1 week) — Done (merged into 1.1)

  • Placeholder regex rejection, spam word tiers, regenerate loop
  • Delivered with Sprint 1.1

Phase 2 — Operator experience (68 weeks) — Done

Goal: Web UI + hardening for FillCare daily use.

Sprint 2.0 — Monorepo foundation — Done

Sprint 2.1 — Web dashboard MVP (3 weeks) — Done

  • Vite + React + shadcn operator dashboard
  • Dashboard, campaign wizard, campaign detail, mailboxes, settings
  • See docs/sprints/sprint-2.1.md

Sprint 2.2 — Spam rescue hardening (2 weeks) — Done

Sprint 2.3 — DNS & health checks (1 week) — Done

Sprint 2.4 — Job queue (2 weeks) — Done

FillCare QA: docs/fillcare-qa-playbook.md


Phase 3 — SaaS readiness (812 weeks)

Goal: Multi-tenant, billing, optional integrations.

  • Postgres migration path
  • Workspace + JWT auth
  • Stripe billing per primary
  • Webhooks (campaign events)
  • Google Postmaster integration
  • Session-based web auth
  • Optional peer network (beta)

Phase 4 — Scale & ecosystem (ongoing)

  • Instantly / Smartlead sync
  • Inbox placement tests
  • Team roles
  • White-label
  • Mobile notifications

Milestone timeline (visual)

2026 Q2  [Phase 1: Core backend        ██████████]
2026 Q3  [Phase 2: Web UI + hardening  ░░░░████████]
2026 Q4  [Phase 3: SaaS beta           ░░░░░░░░████]

FillCare-specific milestone

Week Milestone
1 hello@fillcareapp.com campaign created, 4 satellites assigned
2 Grow recipe running, stats visible via API
4 Web dashboard live
6 30-day warmup complete, inbox rate ≥95%
8 Maintenance mode + cold email tool connected

Definition of done (per phase)

Phase 1 done when

  • 2+ primaries warming concurrently
  • All 4 recipes pass integration tests
  • Stats API accurate
  • Reply rate configurable and honored
  • AI validator blocks placeholders
  • ESP compliance checklist passable (GET /api/campaigns/:id/compliance)

Phase 2 done when

  • Operator never needs curl for daily use
  • Auto-pause tested on simulated spam spike (unit threshold tests + rescuer integration path)
  • FillCare running 30-day campaign via UI (operator acceptance — see FillCare QA playbook)
  • Dashboard usable on phone (375px) for monitoring; setup flows work on tablet+

Phase 3 done when

  • Second customer onboarded in isolated workspace
  • Billing active
  • Security review complete